- The project required extensive erosion control measures due to the heavy pedestrian traffic within close proximity to the site.
- Cleaning and grubbing proceeded stripping and stockpilling of topsoil for later reuse in swale, in addition to imported aggregate material.
- Storm drainage infrastructure was supplied and installed once all earthworks were completed.