Client
Project Value
Location
Key Highlights
- Removal and disposal of existing culvert, asphalt and other material deemed unsuitable for re-use
- Supply and installation of a 4-sided precast concrete culvert.
- Supply and placement of 200 tonnes of granular B Type II.
- Shoreline protection in the form of armor stone, welded, wire mesh gabion basket and rip rap.
- Installation of two new energy attenuator guide rail end treatments.
- Use of turbidity curtains
- Reinstatement of road with HL-3 and HL-8 hot mix.
- Job Site located in a remote area.