Client

The Regional Municipality of Waterloo.

Project Value

$600,000.00.

Location

Kitchener, Ontario.




Key Highlights

  • Supply and install 665 face metres of variable height noise wall.
  • Supply and install 410 face metres of variable height retaining wall.
  • Installation of 800m2 of concrete sidewalk.
  • Supply and install storm sewer infrastructure, including storm sewers, catch basins and manholes.
  • Erosion control included light duty silt fencing, sediment basin and temporary rip-rap and woven filter fabric.
  • Site remediation included 3400m² of sod.
  • Extensive traffic control measures implemented as construction site near to street with with high traffic volume.