Client
Project Value
Location
Key Highlights
- Demolition of a 31,885 square foot hockey arena.
- Demolition of an additional 4,650 square foot concrete structure.
- Removal and disposal of designated substances, including the use of type 3 asbestos operations for texture coating and piping.
- Site boundaries are within feet of residential property therefore extensive planning and controls required to mitigate damage to surroundings
- Pedestrian traffic controls implemented to allow residence to efficiently access their properties.
- Salvage of 5500 pieces of brick to be re-used by the Town for future use.