- Winter Work.
- Demolition of multiple structures.
- Abandonment and protection of monitoring wells.
- Protection, relocation and reinstatement of utilities.
- Excavated impacted soils to the prescribed depths:
- Disposal of 2,500 tonnes of petroleum hydrocarbon impacted soil;
- Segregation of 1,000 tonnes of clean fill that was later used as backfill; and
- Disposed of approximately 200,000 litres of ground water off-site.
- Reinstatement of storm sewer and installation of an oil/water separator.