Client
Project Value
Location
Key Highlights
- Removal and disposal of existing culvert, asphalt and other material deemed unsuitable for re-use.
- Supply and placement of 1000 tonnes of a combination of granular A & B.
- Supply, on-site assembly and installation of two 4293*2667 SPCSPA culverts at separate locations.
- Extensive traffic control implemented throughout the period of construction, including flagman and extensive signage.
- Fish relocation and temporary stream division.
- Reinstatement of road using HL-3 and HL-8 hot mix.
- Supply and installation of imported topsoil, erosion control blanket and seed.