James Wilson Road No. 10 Replacement

  • south_frontenac_1
  • south_frontenac_9
  • south_frontenac_8
  • south_frontenac_4
  • south_frontenac_9

Client

The Corporation of the Township of South Frontenac.

Project Value

$130,000.00.

Location

South Frontenac, Ontario.




Key Highlights

  • Removal and disposal of existing culvert, asphalt and other material deemed unsuitable for re-use
  • Supply and installation of a 4-sided precast concrete culvert.
  • Supply and placement of 200 tonnes of granular B Type II.
  • Shoreline protection in the form of armor stone, welded, wire mesh gabion basket and rip rap.
  • Installation of two new energy attenuator guide rail end treatments.
  • Use of turbidity curtains
  • Reinstatement of road with HL-3 and HL-8 hot mix.
  • Job Site located in a remote area.