Projects

  • Biofuel Refinery Plant Demolition & Remediation

    Demolition and remediation prior to sale of the property. Site was formerly used as a wood-to-biofuel refinery, metal smelting plant and wire manufacturing facility. All activities performed in a truncated time-scale as property was listed as unneces...
  • Culvert Replacement On County Road 8

    Implemented water diversion controls in order to isolate work area form the main flow of the stream. Removal and disposal of existing culvert, asphalt and material deemed unsuitable for re-use on site. Supply, assembly and installation of a 33 metre ...
  • Culvert Replacements on Century Farm Road & Lifford Road

    Removal and disposal of existing culvert, asphalt and other material deemed unsuitable for re-use. Supply and placement of 1000 tonnes of a combination of granular A & B. Supply, on-site assembly and installation of two 4293*2667 SPCSPA culverts...
  • Demolition of Memorial Arena & Lions Club Hall

    Demolition of a 31,885 square foot hockey arena. Demolition of an additional 4,650 square foot concrete structure. Removal and disposal of designated substances, including the use of type 3 asbestos operations for texture coating and piping. Site bou...
  • Fairway Road Extension

    Supply and install 665 face metres of variable height noise wall. Supply and install 410 face metres of variable height retaining wall. Installation of 800m2 of concrete sidewalk. Supply and install storm sewer infrastructure, including storm sewers,...
  • Flower Town Motel Demolition

    Application and acquisition of demolition permit. Site fencing and utility locates. Disconnects and capping of property. Demolition of motel including 14 motel units, residence and garage including footings and back fill with suitable fill. Various t...
  • Grange Side Road Concrete Open Footing Culvert Replacement

    Replacement of existing open footing concrete culvert with a precast concrete culvert and footings. The culvert was installed to the following specifications: 3.0 x 2.1 metre concrete culvert; Removal and disposal of 345 square metres of asphalt Inst...
  • Gravel Road Culvert Reconstruction

    Removal and disposal of existing culvert, asphalt and material deemed unsuitable for re-use on site. Supply and installation of precast concrete culvert with the use of a crane. Silt fencing, fish removal and water by-pass implemented. Backfill struc...
  • James Wilson Road No. 10 Replacement

    Removal and disposal of existing culvert, asphalt and other material deemed unsuitable for re-use Supply and installation of a 4-sided precast concrete culvert. Supply and placement of 200 tonnes of granular B Type II. Shoreline protection in the for...
  • Metrolinx Acoustic Sound Fence

    Installation only of an acoustic sound barrier fence on behalf of GO Transit at the Newmarket Bus Terminal (supply by Cedar Springs Landscaping). The fence was installed to the following specifications: 240 metres long; 2.5 metres in height; 450mm di...
  • Minstry of Natural Resources Demolition & Site Remediation

    Winter Work. Demolition of multiple structures. Abandonment and protection of monitoring wells. Protection, relocation and reinstatement of utilities. Excavated impacted soils to the prescribed depths: Disposal of 2,500 tonnes of petroleum hydrocarbo...
  • Mohawk Park Slope Repairs

    The project required extensive erosion control measures due to the heavy pedestrian traffic within close proximity to the site. Cleaning and grubbing proceeded stripping and stockpilling of topsoil for later reuse in swale, in addition to imported ag...
  • OTrain-2

    O-Train Precast Noise Barrier Wall

    Installation of an acoustic sound barrier fence on behalf of the City of Ottawa along the O-Train Line providing a noise barrier between the railway and residential housing. The fence was installed to the following specifications: 280 metres long; 3 ...
  • Oshawa Harbour PhytoHydraulic Barriers

    Excavation and disposal of 400 tonnes of contaminated soil. Excavation and stockpiling of 100 tonnes of uncontaminated soil for future reuse. Siltation controls, including heavy duty silt fencing, implemented in order to minimize the input of silt in...
  • Rehabilitation Of Haida Drive Culvert

    Site preparation activities included temporary silt fencing, fish removal, clearing & grubbing, cofferdams and by-pass pumping. Extensive traffic control plan implemented since the site is located in an area with high vehicular and pedestrian tra...
  • Supply & Planting of Trees

    Removed stumps ranging between 5 to 120cm in diameter of over 1600 trees to below 24” of ground levels. Planted over 1900 trees of various species that all met the stringent specifications of the City of Vaughan. Watering and maintaining planted tr...
  • Tottenham Airfield Remediation And Site Restoration

    Provision of over 600,000 m3 of imported soil fill. Average between 75,000 m3 and 150,000 m3 per month. Relocation of an additional 300,000 m3 of material that impeded the construction of new runways. Erosion control methods including silt fencing, e...