Client
Project Value
Location
Key Highlights
- Implemented water diversion controls in order to isolate work area form the main flow of the stream.
- Removal and disposal of existing culvert, asphalt and material deemed unsuitable for re-use on site.
- Supply, assembly and installation of a 33 metre long 2400mm diameter CSP culvert.
- Supply and placement of 1900 tonnes of granular A and 2800 tonnes of granular B.
- Reinstatement of road using HL-3 and HL-8 hot mix.
- Installation of 90 meters of steel beam guiderail.
- Extensive erosion control measures and traffic control plan implemented and maintained throughout the duration of the project.
- Roadway closed during construction. Adequate signs, barricades and barriers implemented to safely protect the work area.